Menu
Back To Back Installation

What is a back-to-back installation?

For a single-storey building, the standard installation includes a maximum 3-meter length of the copper pipes between the indoor unit and the compressor (for low-set homes or buildings). Any additional distance will incur extra charges. The cost for each additional meter beyond this standard distance is $50 to cover expenses for the ducting, copper, and electrical work.

For a two-storey building, the standard installation includes a maximum of 4 meter of copper pipes between the indoor unit and the outdoor unit (for high-set homes or buildings). Any additional distance will incur extra charges. The cost for each additional meter beyond this standard distance is $50 to cover the expenses for the ducting, copper, and electrical work.

Ground Level
2.5kW to 3.5kW
from $450 plus GST
Ground Level
5kW to 9kW
from $550 plus GST, and plus electrical work
First Level
2.5kW to 3.5kW
from $550 plus GST
First Level
5kW to 9kW
from $650 plus GST, and plus electrical work